Types of mandate
Parallel study mandate in a proxy pool
with general contractor - 2nd prize
Dates
2007
Technical
informations
1'330 m2 de SBP, 5'194 m3 SIA (416)
Location
Vésenaz
Collaborators
J. Leresche, S. Chambat, L. Chareyre
Project
In order to address the growing need for nursery places across five municipalities, this project shared between the concerned municipalities opens up 88 places. The project had three main objectives: to facilitate and increase contact with the outside by opening the building, to create intermediate spaces between the inside and the outside, and to maximize the use of natural light thus creating a comfortable atmosphere while saving energy. The facades served as supporting elements, with the central core providing the bracing, so that the interior spaces could be partitioned freely in line with the institutional project.