Types of mandate
Preliminary project in association with Kheops Constructions SA
(Mr. Strazza)
Dates
Ongoing preliminary project
Project : Ongoing
Technical
informations
3,340 m2 GFA10,020 m3 SIA
10,020 m3 SIA
14 apartments of 1.5 rooms each
5 apartments of 2 rooms each
8 apartments of 3 rooms each
9 apartments of 4 rooms each
Location
Geneva
Collaborators
A. Micoud
Project
The problem of building elevations brought on by the growing need for housing is both an urban and architectural challenge. In this sense, the rue Liotard project on a "bar" of five buildings demonstrates that this layout allows for the elevation of two levels of housing. The proposed styles are inspired by current levels while allowing for better proportions of the rooms. The expression of the façades follows the layout of the lower floors while also offering a specific language (in terms of materials and colour).