Building permit: July 1998
End of construction: 2001

Technical
informations

3’821 m2 SBP, 16’490 m3 SIA

Location

Le Sentier

Collaborators

P. Gavin, M. Jacobson

 

Project

As part of the complete renovation of the facades of the “Atmos” building, we have redesigned the vertical spaces, and created new workshops and a delivery area on the ground floor. The facades, made up of prefabricated elements, were clad and insulated with powder-coated steel housings.

 