Types of mandate
Project and execution
Dates
Building permit: September 2006
Construction site finished: August 2007
Technical
informations
671 m2 de SBP, 3'100 m3 SIA
Location
Plan-les-Ouates
Collaborators
L. Bionda, J. Leresche, S. Lombard, J.-P.Gebel
Project
Creation of one-storey extracurricular premises opening onto an interior patio, designed for outdoor games. The roof is green. The project will be treated as a complement to an existing school building in contemporary style, with type 4 exposed concrete walls in the form of parallel slats of variable lengths and glass gables. In the basement there is a sports hall and a games room.