Types of mandate
Project and execution
Dates
Building permit : June 2016
Construction site timeline: September 2016 - December 2017
Technical
informations
588 m2 SBP, 2’123 m3 SIA
Location
Collonge-Bellerive
Collaborators
V. Angiolini, P. Gaucher, A. Micoud
Raising height in three dimensions
Conversion and elevation of a house on the lake shore.
As the house is located on the 30m non-buildable limit of the lake shore, the authorisation to increase its height was granted on condition that the existing height at the tip of the roof is not exceeded. Thus, instead of simply adding a new floor to the house, we reworked the volume and in particular the roof, thus giving the house a new silhouette.